×

Utility Work to begin Monday, June 23rd on SR-29/US-Hwy 27 in Rhea County from Dewey Sheppard Lane to Whites Creek Road/Jenkins Waldo Lane

By Ronni Chase Jun 21, 2025 | 10:59 AM

TDOT reports that utility work is scheduled to begin on Monday (June 23, 2025) on State Route 29/ US-Highway 27 from Dewey Sheppard Lane to Whites Creek Road/Jenkins Waldo Lane.  Motorists should reduce speed and be prepared to stop. Trucks, message boards, flaggers, and barrels and cones will be present through July 2nd, from 9 am to 2 pm.

Rhea County motorists are also reminded that utility work is being conducted on State Route 68/Watts Bar Highway between State Route 27/ Rhea County Highway and Walker Road.  The work will conducted from 9am to 2pm through June 27th and motorists should reduce speed and be prepared to stop in the area.